Warsan Club House - Restaurants - 2nos
Project: Warsan Club House - Restaurants - 2nos
Location: Warsan Club House, Warsan, Dubai
Client: Jing Gang Trading FZE
​
Area : 8000 Sq.ft
Scope: Supply & Installation of G.I Duct work, Air outlets, Water Supply & Drainage for wash rooms, Lighting, Power sockets, DB - 2nos, Modification of SMDB - 1no.
CHUN QIU ENTERTAINMENT
Project: Chun Qiu Entertainment - Snookers Club
​
Location: Block C, Warsan Souq, Dubai
Client: Jing Gang Trading FZE
​
Area : 6800 Sq.ft
Scope: Design (MEP), Supply & Installation of FCU (13nos), Valve Kits, Pressure Test, Chemical Treatment, Water Supply, Drainage, Lighting, Timer for Sign Board, Power Sockets, Floor Sockets and DB, SMD Dressing.
YOUR PLACE PING PONG CLUB
Project: Your Place Ping Pong Club
​
Location: Block C, Warsan Souq, Dubai
Client: Jing Gang Trading FZE
​
Area : 1600 Sq.ft
Scope: Supply & Installation of FCU (3nos), Valve Kits, Pressure Test, Chemical Treatment, Lighting, Sensors for Lighting, Timer for Sign Board Power Sockets, Floor Sockets and DB, Dressing.
AL GHURAIR CENTRE
SPINNEYS SUPER MARKET
Project: Spinneys Supermarket
​
Location: Al Ghurair Centre, Dubai
Client: Spinneys Dubai L.L.C
​
Area : 21,500 Sq.ft
Scope: Installation of Fan Coil Units (20nos), Supply & Installation of the Chilled water pipe network, Valve packages,
Pressure test & Chemical Treatment.
NAKHEEL MALL
WAITROSE SUPERMNARKET
Project: Waitrose Supermarket - Nakheel Mall
​
Location: Palm Jumeriah, Dubai
​
Client: Fine Fare Food Market
​
Area : 44,000 Sq.ft
​
Scope: Installation of Fan Coil Units (20nos), AHU (8nos), FAHU -1no, Ecology Unit, Supply & Installation of the Chilled water pipe network, Valve packages,
​
Pressure test & Chemical Treatment, Testing & Commissioning.
CARREFOUR - ENERGY RETORFIT
Project: Carrefour - Energy Retrofit
​
Issue: Tripping of water-cooled chiller due to improper flow pattern in condenser water network. When one Water Cooled Chiller working, 3 cooling tower & 3 Condenser pumps working.
Location: Airport road, Abu Dhabi
​
Scope: Modification of existing pipework for installation of valves.
Installation of Motorized butterfly on condenser outlet and Cooling tower outlet.
Supply & Installation of BMS Cables, Cable Tray, termination, etc.
Connecting the motorized valves to Chiller Plant Manager.