top of page
Club house GF 1.jpeg

Warsan Club House - Restaurants - 2nos

Project: Warsan Club House - Restaurants - 2nos

Location: Warsan Club House, Warsan, Dubai

 

Client: Jing Gang Trading FZE

​

Area : 8000 Sq.ft

 

Scope: Supply & Installation of  G.I Duct work, Air outlets, Water Supply & Drainage for wash rooms, Lighting, Power sockets, DB - 2nos, Modification of SMDB - 1no.

13 Shop 3.jpeg

CHUN QIU ENTERTAINMENT

Project: Chun Qiu Entertainment - Snookers Club

​

Location: Block C, Warsan Souq, Dubai

 

Client: Jing Gang Trading FZE

​

Area : 6800 Sq.ft

 

Scope: Design (MEP), Supply & Installation of  FCU (13nos), Valve Kits, Pressure Test, Chemical Treatment, Water Supply, Drainage, Lighting, Timer for Sign Board, Power Sockets, Floor Sockets and  DB, SMD Dressing.

IMG_5079.JPG

YOUR PLACE PING PONG CLUB

Project: Your Place Ping Pong Club

​

Location: Block C, Warsan Souq, Dubai

 

Client: Jing Gang Trading FZE

​

Area : 1600 Sq.ft

 

Scope: Supply & Installation of  FCU (3nos), Valve Kits, Pressure Test, Chemical Treatment, Lighting, Sensors for Lighting, Timer for Sign Board Power Sockets, Floor Sockets and  DB, Dressing.

Al Ghurair Centre Spinneys Super Market.png

AL GHURAIR CENTRE
SPINNEYS SUPER MARKET

Project: Spinneys Supermarket

​

Location: Al Ghurair Centre, Dubai

 

Client: Spinneys Dubai L.L.C

​

Area : 21,500 Sq.ft

 

Scope: Installation of Fan Coil Units (20nos), Supply & Installation of the Chilled water pipe network, Valve packages,

           

Pressure test & Chemical Treatment.

IMG_5000.JPG

NAKHEEL MALL 
WAITROSE SUPERMNARKET

 

Project: Waitrose Supermarket - Nakheel Mall

​

Location: Palm Jumeriah, Dubai

​

Client: Fine Fare Food Market

​

Area : 44,000 Sq.ft

​

Scope: Installation of Fan Coil Units (20nos), AHU (8nos), FAHU -1no, Ecology Unit, Supply & Installation of the Chilled water pipe network, Valve packages,

​

Pressure test & Chemical Treatment, Testing & Commissioning.

Carrefour.jpg

CARREFOUR - ENERGY RETORFIT

Project: Carrefour - Energy Retrofit

​

Issue: Tripping of water-cooled chiller due to improper flow pattern in condenser water network. When one Water Cooled Chiller working, 3 cooling tower & 3 Condenser pumps working.

 

Location: Airport road, Abu Dhabi

​

Scope: Modification of existing pipework for installation of valves.

               

Installation of Motorized butterfly on condenser outlet and Cooling tower outlet. 

                   

Supply & Installation of BMS Cables, Cable Tray, termination, etc.

                   

Connecting the motorized valves to Chiller Plant Manager.

bottom of page