top of page

We are HVAC contractor for community malls, hotels, and logistic centers. We are also MEP Contractor for Fit-Out Works and Villas.

COMPLETED
FIT OUT
MEP WORKS
100,000+ Sqft

VENTILATION
& AIR
CONDITIONING
500,000+ Sqft

We book limited projects from selective clients, so we can give best output in terms of Quality & on time Delivery.

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Muneer Ahmed, Warsan Souq, Nakheel

Chin Qiu, Warsan Souq, Dubai

Spinneys, Khalidiya, Abu Dhabi

FOLLOW US ON FOR DAILY TECHNICAL UPDATES

  • IMG_1708
  • IMG_5000
  • 2020-09-02_02-50-10_18217827315f4f78e2c3c4d_key-5-1599043811
  • IMG_1708

 

Our clients are rewarding BTU Electromechanical Works L.L.C, with repetitive projects as we are addressing their needs and requirements, with in the scheduled time and best quality.

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Nakheel

Ping Pong, Warsan Souq, Dubai

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Nakheel, Waitrose

Waitrose, Nakheel Mall, Palm Jumeriah

List of Fit Out MEP Projects

Your Place Ping Pong

Chin Qiu Entertainment Center

Chin Qiu Entertainment Center Br-1

Kizad Logistic Park C - 06

Warsan Club - Restaurants

Live Fish - Qin Yuan Trading

Amber Kosmetic

Lemas Coffee Shop

To Receive MEP Technical Updates

Thanks for subscribing!

HVAC Projects

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, INL DWC LLC, Muneer Ahmed
Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, INL DWC LLC, Muneer Ahmed

INTEGRATED NATIONAL LOGISTICS DUBAI WORLD CENTRAL LLC

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, INL DWC LLC, Muneer Ahmed

Integrated National Logistics is Design & Build project. It is 226,000 Sq. ft huge logistic facility with 100 Vertical Racks. This is project is executed during corona period. The following are highlights of the project:

  • Chillers - 2 nos x 323 TR.

  • AHU - 12nos

  • FAHU - 2nos

  • Chilled Water Pumps - 3nos

  • Fabric Duct - Wuhan, China

  • G.I Duct Size 2000 mm x 1000 mm

  • Facility Under Operation

AL SEER CHILLED WAREHOUSE - SPINNEYS LOGISTICS CENTRE

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Kizad, Abu Dhabi, Muneer Ahmed
Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Kizad, Muneer Ahmed

PRIEMIER INN HOTEL - IBN BATTUTA MALL

Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Premier Inn Hotel Ibn Battuta Mall, Muneer Ahmed
Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Premier Inn Hotel Ibn Battuta Mall, Muneer Ahmed
Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Premier Inn Hotel Ibn Battuta Mall, Muneer Ahmed
Btu Electromechanical Works LLC, MEP Contractor, HVAC Contractor, HVAC Design, MEP Design, Pump Head Calculation, ESP Calculation, Warsan Souq, Premier Inn Hotel Ibn Battuta Mall, Muneer Ahmed

KHALIDIYA SPINNEYS, ABU DHBAI- REFURBISHMENT - 25,000 SQ.FT 

The biggest challenge in this project is, supermarket is operating 24 x 7.

 

There is active customer movement in the market.

 

Spinneys supermarket is spread across 2000 Sq.mt.

Site is divided into no : of zones and limited time period is allocated to complete the works for all services.

 

Day to Day Co-ordination is required as we shall come to know how run to services, once existing ceiling is removed.

To Receive MEP Technical Updates

Thanks for subscribing!

bottom of page