top of page

Chilled Water Pipe Subcontractor

Partner with HVAC Specialists 

Photo for Landing page(2).png

Muneer Ahmed

B.E | MBA | PMP | LEED Green Associate

 

Co-founder & Project Manager

BTU Electromechanical Works LLC, Dubai, United Arab Emirates

 

Chilled Water Pipe Subcontractor

We ensure successful project completion by timely securing the required materials for installation, coordinating with other services and continuously monitoring both quality and floor wise delivery dates.

1. Efficient Material Management

Our dedicated supervisor ensures the availability of required materials for the next 30 days by closely coordinating with your engineer.

2. Co-ordination With Other Services

Our experienced team members expertly coordinate with MEP services to prevent rework, enhancing project efficiency.

3. Smooth Testing & Commissioning

Trust us for smooth testing and flawless commissioning within the chilled water network.

4. Quality & Timely Delivery

Count on our quality assurance through meticulous internal checklists. Our commitment to monitoring weekly progress ensures on-time project completion.

 

Say NO to errors in Chilled Water Pipe Installation  Partner with Best Chilled Water Pipe Subcontractor!

We Help you Eliminate:

Why BTU Electromechanical Works LLC?

Because we aim for excellence through "Specialized Training"

Boosting your project's success, we provide project-specific training to our Chilled Water Pipe Installation Team on:

Fitting Type & Application

Pipe Supports & Models

Insulation Thickness

& Applications

Valve Package Details

Floor wise Completion Dates

Internal Quality Check List

Complementary Technical Expertise

As a professional Chilled water pipe contractor we provide following as complementary technical expertise to our clients upon confirmation of chilled water pipe installation works

Test Pressure

Test Pressure = 1.5 x MWP

MWP =Maximum Working Pressure

Review CHWP Network

Check CHW Schematic Pipe Sizing

Pump Head Calculation

Chilled Water Pump head Calculations

Premium Technical Expertise

As a professional Chilled water pipe contractor in addition to complementary technical expertise we provide following premium services to our clients -

Review Typical Floor

Check CFM / Sq.ft for each room or Fan Coil Unit

Review Ventilation

Check Ventilation Schematic Duct Sizing

ESP Calculation

FAHU ESP

Calculations

Chilled Water Pipe Contractor

our experienced team of chilled water pipe fitters, insulators, and certified welders excel in providing top-notch installation services. As a leading Chilled Water Pipe Contractor for Residential Tower, Office Tower Hotel, Shopping Mall and Warehouse - we specialize in the precise installation of chiller systems, chilled water pumps, FAHU, AHU, FCU, valve packages, and chilled water pipe works. Our commitment to high quality and timely delivery ensures every project is completed with exceptional workmanship and strict adherence to industry standards. Trust our expertise and partner with us for your next project as a Chilled Water Pipe Contractor.

2020-09-02_02-50-10_18217827315f4f78e2c3
01 IMG_5002_edited_edited_edited.jpg

Partner with us

Partner with us

Satisfied Clients Speak

Discover the impact of our work through satisfied client voices. Their experiences speak to our quality and commitment we bring to every project.

Our Mission

We are on a mission to create awareness and improve Indoor Air Quality

of 10,000 Villas in U.A.E by Year 2040.

Empowering Future Engineers

Beyond our mission, we're empowering the children of our operatives with:
1. Academic Guidance 2. Financial Assistance 3. Technical Training
guiding them towards becoming skilled engineers. Our comprehensive mentorship program aims to pave the way for promising employment opportunities in Dubai, securing a brighter tomorrow.

We Are ...

HVAC Design & Build Contractor

HVAC Design, Supply, Installation,
T&C

  • Hotels

  • Office Tower

  • Residential Towers

  • Community Malls

  • Logistics Centres

MEP Design & Build Contractor

MEP Design, Supply, Installation,
T&C

  • Retail Showrooms

  • Restaurants

  • Supermarkets

  • Villa

  • Hotel Renovation

Chilled Water Pipe
Sub Contractor

Quality Installation &
Timely
Delivery

  • Hotels

  • Office Tower

  • Residential Towers

  • Community Malls

  • Logistics Centres

YouTube | BTU Electromechanical Works LLC

YouTube | BTU Electromechanical Works LLC
Chilled Water Flow Rate Calculation -HVAC -Muneer Ahmed - BTU Electromechanical Works LLC #hvac

Chilled Water Flow Rate Calculation -HVAC -Muneer Ahmed - BTU Electromechanical Works LLC #hvac

04:39
Play Video
Sizing Of Inertia Base - Muneer Ahmed - Chilled Water Pump

Sizing Of Inertia Base - Muneer Ahmed - Chilled Water Pump

05:42
Play Video
How to get 100% effective Duct Length? Duct work at AHU Outlet | HVAC Coach | Muneer Ahmed #ductwork

How to get 100% effective Duct Length? Duct work at AHU Outlet | HVAC Coach | Muneer Ahmed #ductwork

03:01
Play Video
9 Important Points to check before replacing a chiller !! Muneer Ahmed | HVAC Coach | BTU #chiller

9 Important Points to check before replacing a chiller !! Muneer Ahmed | HVAC Coach | BTU #chiller

04:07
Play Video

Our Blogs

Your FREE Expertise Resource:
Download the Step-by-Step Guide -

"How Much Pressure is Required To
Test your Chilled Water Pipe Network"

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube

Get your FREE guide here!

Quick Links

Contact Us

BTU Electromechanical Works LLC works with contractors, supplier, clients. BTU execute HVAC Projects, Fit out MEP Works and provide ESP Calculations, Pump Head Calculation and Heat Load Calculations.

BTU ELECTROMECHANICAL WORKS LLC

2101, Latifa Tower, Sheikh Zayed Road,

Dubai. United Arab Emirates.

P.O. Box  392754

Blue Swan Beauty and Spa Logo.png
4.png
6.png
5.png

© 2018 BTU. All Rights Reserved.

Sat - Thu : 9:00 - 17:00

bottom of page