Heat Load Calculation, ESP Calculation,
& Pump Head Calculation
Partner with HVAC Design Specialists
Muneer Ahmed
B.E | MBA | PMP | LEED Green Associate
Co-founder & Project Manager
BTU Electromechanical Works LLC, Dubai, United Arab Emirates
Empower HVAC Suppliers
From efficient design to critical calculations, including Heat Load, ESP, and Pump Head, we equip HVAC Equipment Suppliers with a winning edge. We are HVAC Design & Build contractor for big projects and MEP Design & Build contractor for Fit out works.
1. Seal Mega-project Deals
Elevate your negotiation game for Megaprojects by presenting a complete package: Design, Heat Load, ESP, and Pump Head Calculations.
2. Efficient Equipment Upgrades
When clients seek equipment changes, our detailed HVAC & Plumbing design reports and calculations ensure seamless transitions.
3. End-to-End Design & Build Expertise
From conceptualization to execution, we deliver turnkey services for HVAC & Plumbing Systems.
01
HVAC Equipment Suppliers:
-
Heat Load Calculation & Ventilation Calculation
-
Duct & Pipe Sizing
-
Design Drawings
02
Pump Suppliers: Pump Head Calculations
-
Chilled Water - Primary
-
Chilled Water - Secondary
-
Condenser Water Pump Head Calculation
-
Transfer Pump Head Calculation
-
Booster Pump Head Calculation
-
Hot Water Pump Head Calculation
-
Circulation Pump Calculation
-
Sump Pump
03
Fans, AHU, FAHU Suppliers: ESP Calculations
-
FCU, AHU & FAHU,
-
Toilet Extract Fans
-
General Extract Fans
-
Makeup Fans
-
Car Park - Extract & Make up Fans
-
Staircase Pressurization Fans
-
Lift Core Pressurization Fans
-
Lobby Extract Fans
-
Transformer Ventilation Fans
04
Team Experience:
-
JBR - High Rise Towers
-
Dubai Marina Mall
-
Dubai Frame
-
Hyatt Regency
-
Al Jubail Market - Sharjah
-
EXPO 2020 - Mobility, Tunnel, Al Wasl
-
Fly Dubai Head Quarters
Say NO to errors in
ESP Calculations | Partner with us!
We Help you Eliminate:
Overdesign
High Power Bills
Delay in Progress
Poor System Performance
Problems in T&C
Non Compliance to Codes
Why BTU Electromechanical Works LLC?
We ensure Efficiency Empowered HVAC System for your project through:
Energy Efficient Design
Value Engineering
Cost Saving Proposal
Unlike other competitors, we are flexible with our clients or Main Contractors to procure high value items (Chillers, AHU, FAHU, FCU) by themselves, that minimize the project cost to the client.
As a professional HVAC Design & Build Contractor we will review the HVAC design in detail and offer value engineering and cost saving proposals in compliance to codes, without compromising on quality and energy efficiency.
The kind of the customers who love our work are the ones who are looking for Energy Efficient & Cost-effective solutions, Quality & Timely delivery, Customer satisfaction & Long-term business association.
Satisfied Clients Speak
Discover the impact of our work through satisfied client voices. Their experiences speak to our quality and commitment we bring to every project.
ESP Calculation, Pump Head Calculation & Heat Load Calculation:
B T U provide technical support to HVAC Equipment Supplier to increase their sales. We provide Design,Heat Load Calculations, ESP Calculations, Pump Head Calculations, Drawings which will give our clients the technical advantage over their competitors. We are HVAC Design & Build contractor for big projects and MEP Design & Build contractor for Fit out works.
-
Especially while negotiating for Megaprojects you can offer Complete Design, Heat Load Calculations, ESP Calculations & Pump Head Calculations.
-
HVAC & Plumbing design report and calculations when clients required to change the existing equipment.
-
Complete Design & Build Services for HVAC & Plumbing Systems.
The following are the details of our Engineering services to respective suppliers:
HVAC Equipment Suppliers:
-
Heat Load Calculation & Ventilation Calculation
-
Duct & Pipe Sizing
-
Design Drawings
Pump Suppliers: Pump Head Calculations
-
Chilled Water - Primary
-
Chilled Water - Secondary
-
Condenser Water Pump Head Calculation
-
Transfer Pump Head Calculation
-
Booster Pump Head Calculation
-
Hot Water Pump Head Calculation
-
Circulation Pump Calculation
-
Sump Pump.
Fans, AHU, FAHU Suppliers: ESP Calculations
-
FCU, AHU & FAHU,
-
Toilet Extract Fans
-
General Extract Fans
-
Makeup Fans
-
Car Park - Extract & Make up Fans
-
Staircase Pressurization Fans
-
Lift Core Pressurization Fans
-
Lobby Extract Fans
-
Transformer Ventilation Fans
Team Experience:
-
JBR - High Rise Towers
-
Dubai Marina Mall
-
Dubai Frame
-
Hyatt Regency
-
Al Jubail Market - Sharjah
-
EXPO 2020 - Mobility, Tunnel, Al Wasl
-
Fly Dubai Head Quarters