Case Study: How BTU Electromechanical Works LLC - Best Gaming Center HVAC Contractor in Dubai Optimized HVAC for Chaos Kart
The Challenge:
Chaos Kart, a first-of-its-kind entertainment facility in Dubai, spans 2,250 sq. meters, featuring karting tracks, a café, and laser gaming arenas. With varying heat loads across different zones, precise HVAC planning was crucial.
When they approached BTU Electromechanical Works LLC - Best Gaming Center HVAC Contractor in Dubai for our expertise, we conducted an in-depth HAP calculation and proposed an HVAC load of 95 TR, optimized for efficiency and performance. However, the client had received other proposals suggesting 125 TR and 150 TR. Naturally, they questioned why our recommendation was lower.
Our Approach
Understanding that HVAC is not a one-size-fits-all solution, BTU Electromechanical Works LLC - Best Gaming Center HVAC Contractor in Dubai requested a joint meeting with all key stakeholders—the karting specialists (from Manchester), café operators, and laser game experts
Through a detailed heat load analysis, considering:
Lighting, Occupancy & Activity levels in each zone.
Heat dissipation from karts, cafe & gaming equipment.
Ventilation loads of all 3 zones, especially in cafe.
We confidently validated that 95 TR was the optimal capacity—delivering the required cooling while significantly reducing both CAPEX (Capital Expenditure) and OPEX (operational expenditure).
The Outcome
Successfully installed & commissioned an LG VRF system in March 2024
Flawless cooling performance throughout the peak summer months
Client invited us back in October to personally thank us for saving costs while ensuring optimal cooling across the peak summer
Why This Matters?
At BTU Electromechanical Works LLC - Best Gaming Center HVAC Contractor in Dubai, we don’t just install HVAC systems—we engineer solutions that maximize efficiency and cost savings without compromising comfort.
Looking for an HVAC partner who prioritizes performance & savings? Let’s discuss your next project!